ATMOSFAR WikiPlay on Steam

2026 PC Demo procedure · Separate EA notes checked Nov 5, 2026

ATMOSFAR Camp Hub: pack, carry & redeploy

At a glance

Open the Camp Hub and hold G to pack it. Carry it to the Wasp’s empty rear rack and press F at STRAP CAMP HUB. At your destination, pick it up, place it on the ground, open it and deploy equipment from the menu.

Early Access camp issues

Official hotfix 1.0-9 addresses a Camp Hub being placed on top of an already stored Hub. Patch 1.0-6 addresses a camp generator that would not restart after refuelling from zero. These are specific fixes, not new pack-up controls.

Check your build before treating those symptoms as a missing key. Official patch notes. The carry, strap and deployment inputs below remain the 2026 PC Demo procedure.

Before you pack

Start with a deployed Camp Hub, an empty rear rack on the Wasp and a suitable place to set up at your destination. The packing and equipment actions are in the Hub menu.

Pack and attach the Hub

  1. Face the deployed Hub and press F OPEN.
  2. Hold G at PACK UP CAMP HUB. Your character now carries the folded Hub.
  3. Walk to the Wasp’s empty rear rack.
  4. Press F at STRAP CAMP HUB. The folded Hub should be visibly attached to the rear of the craft.

Place it at your next stop

  1. Face the Hub on the rear rack and press F PICK UP CAMP HUB.
  2. Move to suitable ground. Use the on-screen PLACE mouse action; R rotates the placement.
  3. Press F OPEN on the placed Hub.
  4. In Camp Equipment, select an item such as the Crafting table and press Enter DEPLOY.
  5. Deploy the remaining equipment individually, then open the crafting table to use it.

Placing the Hub and deploying its equipment are separate actions. If your workbench is missing after moving camp, check Camp Equipment rather than expecting the old arrangement to appear automatically.

Watch packing and attachment or jump to redeployment.

Reference links

Continue exploring

Search